Meadow Gold Dairy Processing Facility

Meadow Gold Dairy Processing Facility
  • Market Sector
    Food & Beverage Processing
  • Size
    89,012 sq. ft.
  • Project Location
    Las Vegas , NV
  • Company
    Construction
  • Description

    Big-D started this design-build project by assisting the Owner to assess the viability of a new greenfield facility in the Las Vegas area. After months of due diligence, during which Big-D provided site analysis and detailed project cost models, Big-D was given the NTP for construction. The project includes three separate buildings: the main plant, a guardhouse, and a 10,746-sf vehicle maintenance facility (VMF). Attached to the VMF is a 3,000-sf ice cream freezer (for storage of product made elsewhere). The main building has approximately 17,000-sf of refrigerated warehouse. The scope of work also included a truck scale, administrative offices, enclosed milk receiving bays, and processing, packing, mechanical, and blow-mold areas. Finishes in the process areas consists of acid brick flooring and ceramic tile walls. Ceilings are walk-on IMP ceilings with interstitial utility spaces above. Sitework for this facility included off-site improvements and connection of utilities to the processing equipment.

key contacts

  • Forrest McNabb
    Forrest McNabb
    President of National Food and Beverage
    Las Vegas , NV